Skip to content

Dryer WHIRLPOOL WPS D8 WBS EE, 8 kg, D, Heat pump

Original price €659,90 - Original price €659,90
Original price
€659,90
€659,90 - €659,90
Current price €659,90
SKU DGT0213990
Ships within 7 business days Please note that quantities are limited and dynamic. At the time of ordering, the item may be out of stock. We will notify you in a timely manner in the event that we are unable to fulfill the order.

Избери период за изплащане и виж месечната вноска

Месечна вноска Обща сума за плащане ГПР Лихва Банка

Description

Whirlpool heat pump dryer: freestanding, 8.0 kg – WPS D8 WBS EE

Whirlpool freestanding dryer features

  • Spacious drum with a capacity of 7 kg.
  • The exclusive 6th Sense technology constantly monitors the moisture in the drum, protecting clothes and ensuring ideal drying results.
  • Elegant design of the darkened door.
  • Steam drying – a gentle, hygienic function that reduces wrinkles and refreshes clothes.

Technical specifications:

Programs:

  • Delicate fabrics
  • Button lock
  • Shirts
  • Gentle drying
  • Mixed program
  • Maximum start delay (hours): 24
  • Jeans
  • Silk
  • Bed linen

Structural features:

  • End of cycle signal: Yes
  • Door color: Front panel
  • Clogged filter indicator
  • Interior lighting: Yes
  • Weight (kg): 39.5
  • Drying capacity (kg): 8
  • Installation type: Freestanding
  • Full tank indicator
  • Adjustable feet: Yes – all
  • Electric cable length (cm): 150
  • Reversible door hinges

Productivity:

  • Standard cotton programme time at full load (min): 197
  • Rated power (W): 900
  • Current (A): 10
  • Weighted annual energy consumption (kWh): 221
  • Noise level (dBA): 64
  • Energy efficiency class: D

Dimensions:

  • Width (cm): 59.7
  • Depth (cm): 54.5
  • Gross weight (kg): 40.5
  • Height (cm): 84.6

Warranty: 24 months

Compare products

{"one"=>"Select 2 or 3 items to compare", "other"=>"{{ count }} of 3 items selected"}

Select first item to compare

Select second item to compare

Select third item to compare

Compare